Mohamed,
1) Please coordinate with the ETPi and organize the loose cables and wires; tuck them back into the table securely. There should not be any loose cables and wires dangling on the floor of the PC Lab.
2) Also, move the system units in the foyer/printer area onto the floor. Make this extended lab area look better and more presentable. Do not add mice yet.
Thursday, May 29, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
got it
Post a Comment